Limits: From Sugar Land Howell Rd to Belknap Rd -
Map
[PDF]
Length (ft): 3,400
Description: 3-lane concrete road with curb and gutter, from Sugarland-Howell Road to Belknap Road to replace the existing two-lane asphalt road.
Benefit: Improved roadway conditions and pedestrian safety for the residents and traffic near school
Bond Amount: $3,620,000
Total Cost: $4,969,984.22Length (ft): 3,400
Description: 3-lane concrete road with curb and gutter, from Sugarland-Howell Road to Belknap Road to replace the existing two-lane asphalt road.
Benefit: Improved roadway conditions and pedestrian safety for the residents and traffic near school
Bond Amount: $3,620,000
Limits: Intersection of Voss Road and SH 6 -
Map
[PDF]
Length (ft): 300
Description: Construction of right turn lane on Voss Road at the SH 6 intersection. Includes an in-line detention system.
Benefit: Improves traffic flow of the intersection and as well as ponding along the curb.
Bond Amount: $607,680.00 ($510,000 from 2017 Mobility Bond, $97,680.00 from 2023 Mobility Bond).
Total Cost: $589,220.75Length (ft): 300
Description: Construction of right turn lane on Voss Road at the SH 6 intersection. Includes an in-line detention system.
Benefit: Improves traffic flow of the intersection and as well as ponding along the curb.
Bond Amount: $607,680.00 ($510,000 from 2017 Mobility Bond, $97,680.00 from 2023 Mobility Bond).
Limits: Old Richmond Rd @ Pheasant Creek -
Map
[PDF]
Length (ft): 600
Description: Widen asphalt pavement to include turn lanes as well as construct signals and illumination at the intersection.
Benefit: This project will provide construction of right turn lanes, improved traffic signals, improved drainage, and safer roadside parking for the cemetery.
Bond Amount: $330,000
Total Project Cost: $665,000
Length (ft): 600
Description: Widen asphalt pavement to include turn lanes as well as construct signals and illumination at the intersection.
Benefit: This project will provide construction of right turn lanes, improved traffic signals, improved drainage, and safer roadside parking for the cemetery.
Bond Amount: $330,000
Total Project Cost: $665,000
Limits: Voss Road @ Old Richmond Road -
Map
[PDF]
Length (ft): 500
Description: Construct a single lane roundabout at the Duhacsek Park entrance with illumination at the intersection.
Benefit: This project will improve traffic flow at the intersection and provide better lighting to the park entrance.
Bond Amount: $330,000
Total Project Cost: $2,4701,000
Length (ft): 500
Description: Construct a single lane roundabout at the Duhacsek Park entrance with illumination at the intersection.
Benefit: This project will improve traffic flow at the intersection and provide better lighting to the park entrance.
Bond Amount: $330,000
Total Project Cost: $2,4701,000
Limits: City of Sugar Land City Limits to FM 1464 -
Map
[PDF]
Length (ft): 3,300
Description: Construct 2-Lane Concrete 1/2 boulevard section with curbs and storm sewers. Construct traffic Signal at intersection with FM 1464.
Benefit: Provide future access from US 90A to FM 1464, improving mobility.
Bond Amount: $3,470,000
Total Project Cost: $6,960,000
Length (ft): 3,300
Description: Construct 2-Lane Concrete 1/2 boulevard section with curbs and storm sewers. Construct traffic Signal at intersection with FM 1464.
Benefit: Provide future access from US 90A to FM 1464, improving mobility.
Bond Amount: $3,470,000
Total Project Cost: $6,960,000
Limits: From Sugar Land Howell Rd to Belknap Rd -
Map
[PDF]
Length (ft): 4,200
Description: Construct 2-Lane Concrete 1/2 boulevard section with curbs and storm sewers.
Benefit: Provide future access from US 90A to SH 99, improving mobility.
Bond Amount: $9,935,000
Total Project Cost: $10,220,000
Length (ft): 4,200
Description: Construct 2-Lane Concrete 1/2 boulevard section with curbs and storm sewers.
Benefit: Provide future access from US 90A to SH 99, improving mobility.
Bond Amount: $9,935,000
Total Project Cost: $10,220,000
Limits: West Bellfort @ SH 6 -
Map
[PDF]
Length (ft): 1,800
Description: Construct right turn lanes for eastbound and westbound approaches as well as extending the left turn lane for eastbound approach.
Benefit: This project will provide more storage and turning capabilities at the intersection to improve traffic flow.
Bond Amount: $2,230,000
Total Project Cost: $2,230,000
Length (ft): 1,800
Description: Construct right turn lanes for eastbound and westbound approaches as well as extending the left turn lane for eastbound approach.
Benefit: This project will provide more storage and turning capabilities at the intersection to improve traffic flow.
Bond Amount: $2,230,000
Total Project Cost: $2,230,000
Limits: West Airport @ SH 6 -
Map
[PDF]
Length (ft): 1,450
Description: Construct right turn lane for westbound approach. Add storage for existing Left Turn Lanes and 2nd EB LTL.
Benefit: This project will provide more storage and turning capabilities at the intersection to improve traffic flow.
Bond Amount: $1,970,000
Total Project Cost: $2,140,000
Length (ft): 1,450
Description: Construct right turn lane for westbound approach. Add storage for existing Left Turn Lanes and 2nd EB LTL.
Benefit: This project will provide more storage and turning capabilities at the intersection to improve traffic flow.
Bond Amount: $1,970,000
Total Project Cost: $2,140,000
Limits: SH 6 @ US 90 A -
Map
[PDF]
Length (ft): 500
Description:
Phase I: Restripe intersection to consist of 1 U-turn Lane, 3 dedicated left turn lanes, 1 through lane, and 1 dedicated right turn lane. Phase II: Widen under the overpass to have the following lane configuration: 1 U-turn Lane, 3 dedicated turn lanes, 2 through lanes, and 1 dedicated right turn lane.
Benefit: This project will provide more storage and turning capabilities at the intersection to improve traffic flow.
Bond Amount: $570,000
Total Project Cost: $670,000
Length (ft): 500
Description:
Phase I: Restripe intersection to consist of 1 U-turn Lane, 3 dedicated left turn lanes, 1 through lane, and 1 dedicated right turn lane. Phase II: Widen under the overpass to have the following lane configuration: 1 U-turn Lane, 3 dedicated turn lanes, 2 through lanes, and 1 dedicated right turn lane.
Benefit: This project will provide more storage and turning capabilities at the intersection to improve traffic flow.
Bond Amount: $570,000
Total Project Cost: $670,000
Limits: Laurel Green Rd. to 450’ east of Lexington Grove Dr. -
Map
[PDF]
Length (ft): 3,600
Description: Pavement reconstruction and placement of an additional storm sewer trunk line.
Benefit: This project will relieve the existing trunk line from excess flow and improve pavement quality.
Bond Amount: $2,000,000
Total Project Cost: $7,390,000
Length (ft): 3,600
Description: Pavement reconstruction and placement of an additional storm sewer trunk line.
Benefit: This project will relieve the existing trunk line from excess flow and improve pavement quality.
Bond Amount: $2,000,000
Total Project Cost: $7,390,000
Limits: 450’West Brightwater Dr. to FM 1092 -
Map
[PDF]
Length (ft): 3,000
Description: Phase I: Pavement reconstruction and placement of an additional storm sewer trunk line. Phase II: Right turn lane on the eastbound and westbound approaches at the FM 1092 intersection.
Benefit: This project will relieve the existing trunk line from excess flow and improve pavement quality. Additional right turn lanes will provide additional turn movement and improve traffic flow. Eastbound right turn lane will also provide a better transition for emergency vehicles to access SH 6.
Bond Amount: $2,000,000
Total Project Cost: $7,140,000
Length (ft): 3,000
Description: Phase I: Pavement reconstruction and placement of an additional storm sewer trunk line. Phase II: Right turn lane on the eastbound and westbound approaches at the FM 1092 intersection.
Benefit: This project will relieve the existing trunk line from excess flow and improve pavement quality. Additional right turn lanes will provide additional turn movement and improve traffic flow. Eastbound right turn lane will also provide a better transition for emergency vehicles to access SH 6.
Bond Amount: $2,000,000
Total Project Cost: $7,140,000
Limits: SH 6 @ Cullinan Park -
Map
[PDF]
Length (ft): 400
Description: Construct left turn lane on SH 6 into Cullinan Park.
Benefit: This project will provide direct access to Cullinan Park from Northbound SH 6.
Bond Amount: $400,000
Total Project Cost: $500,000
Length (ft): 400
Description: Construct left turn lane on SH 6 into Cullinan Park.
Benefit: This project will provide direct access to Cullinan Park from Northbound SH 6.
Bond Amount: $400,000
Total Project Cost: $500,000
Limits: Old Richmond Road to SH 6 -
Map
[PDF]
Length (ft): 3,400
Description: Reconstruct a 2-lane asphalt roadway into a 3-lane concrete roadway.
Benefit: This project will provide dedicated left turn movement to improvement traffic flow as well as safety along the corridor.
Bond Amount: $5,940,000
Total Project Cost: $6,040,000
Length (ft): 3,400
Description: Reconstruct a 2-lane asphalt roadway into a 3-lane concrete roadway.
Benefit: This project will provide dedicated left turn movement to improvement traffic flow as well as safety along the corridor.
Bond Amount: $5,940,000
Total Project Cost: $6,040,000
Limits: West Bellfort Boulevard to Sugarland-Howell Road -
Map
[PDF]
Length (ft): 5,000
Description: Construct a 3-lane concrete road with curb and gutter, from West Bellfort Boulevard to Sugarland-Howell Road
Benefit: Replace the existing two-lane asphalt road to help relieve congestion and improve user experience
Bond Amount: $7,260,000 (from 2017 bond. 2020 bond added dollars to account for extra budget needed due to inflation).
Total Project Cost: $8,820,000
Length (ft): 5,000
Description: Construct a 3-lane concrete road with curb and gutter, from West Bellfort Boulevard to Sugarland-Howell Road
Benefit: Replace the existing two-lane asphalt road to help relieve congestion and improve user experience
Bond Amount: $7,260,000 (from 2017 bond. 2020 bond added dollars to account for extra budget needed due to inflation).
Total Project Cost: $8,820,000
Limits: NW corner of Packer Ln and Independence Blvd -
Map
[PDF]
Length (ft): 0
Description: Construction of a new Packer Lane Lift Station No. 3 and relocation of associated water, sanitary sewer and storm water utilities as needed to facilitate the extension of Independence Boulevard.
Benefit: Allow for the extension of Independence Blvd to not interfere with the function of the Lift Station
Bond Amount: Zero. This project was not part of the bond, but was instead funded from money saved (not used) from other projects that were done under budget.
Total Project Cost: $962,502.96
Length (ft): 0
Description: Construction of a new Packer Lane Lift Station No. 3 and relocation of associated water, sanitary sewer and storm water utilities as needed to facilitate the extension of Independence Boulevard.
Benefit: Allow for the extension of Independence Blvd to not interfere with the function of the Lift Station
Bond Amount: Zero. This project was not part of the bond, but was instead funded from money saved (not used) from other projects that were done under budget.
Total Project Cost: $962,502.96
Limits: From Sugar Land Howell Rd to Belknap Rd -
Map
[PDF]
Length (ft): 4,450
Description: Construct a 4-lane concrete boulevard with curb and gutter, from West Bellfort Boulevard to the Harris County line to replace the existing two-lane asphalt road and bridge.
Benefit: Match Harris County improvements to make for a seamless user experience. Relieve congestion for local businesses, homes and school. Improve safety near school.
Bond Amount: $9,110,000 (from 2017 bond)
Total Project Cost: $7,500,386.46
Length (ft): 4,450
Description: Construct a 4-lane concrete boulevard with curb and gutter, from West Bellfort Boulevard to the Harris County line to replace the existing two-lane asphalt road and bridge.
Benefit: Match Harris County improvements to make for a seamless user experience. Relieve congestion for local businesses, homes and school. Improve safety near school.
Bond Amount: $9,110,000 (from 2017 bond)
Total Project Cost: $7,500,386.46
Limits: 5th St. to Independence Blvd -
Map
[PDF]
Length (ft): 4,320
Description: Construction of a 2-lane concrete with roadside ditches, 3-lane concrete curbed pavement with a storm sewer system at both the intersection and park. Includes 5" sidewalk on both sides of roadway and a detention pond.
Benefit: Rehabilitate road to improve user experience and increase safety for pedestrians.
Bond Amount: Zero. Design of this project was funded from money saved (not used) from other projects that were done under budget (2020 bond added dollars to account for extra budget needed due to inflation).
Total Project Cost: $5,283,197.00
Length (ft): 4,320
Description: Construction of a 2-lane concrete with roadside ditches, 3-lane concrete curbed pavement with a storm sewer system at both the intersection and park. Includes 5" sidewalk on both sides of roadway and a detention pond.
Benefit: Rehabilitate road to improve user experience and increase safety for pedestrians.
Bond Amount: Zero. Design of this project was funded from money saved (not used) from other projects that were done under budget (2020 bond added dollars to account for extra budget needed due to inflation).
Total Project Cost: $5,283,197.00